
New TopShim run:

version = topshim 2.0.0
date = 2022-12-06
time = 18:51:22.585
command = topshim 

FINE SHIMMING

Parameters:

probe = Z820201_0109
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 4.7 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.446

shim changes: 
Z	-68
Z2	-2
Z3	-150
Z4	-262
Z5	+344

duration = 1 min 12 sec
completed successfully
finished Tue Dec  6 18:52:33 2022


========================================================================
